Green light for two solar plants in Ávila (22 and 27 MW): what it means for the renewable sector
The EIA approves the Colladillo (22 MW) and Cabeza de Mesá (27 MW) solar parks in Ávila to be hybridized with existing w...
Sep 9, 2026
7 min